Linear Collider Forum



Home » ILC Accelerator Design » Global Controls » Proposed new work packages, work packages that that need to be done
Proposed new work packages, work packages that that need to be done [message #882] Thu, 31 May 2007 01:45 Go to next message
carwardine
Messages: 13
Registered: May 2007
Location: Argonne National Laborato...
Please add to this you see fit...

1. Write test criteria for... LLRF system, Controls front-end, Controls Middleware, etc

2. Write use cases for... LLRF software, Controls applications, Remote access, etc

3. Develop algorithms/methods for bpm introspection

4. Create online list of work being done now – by topic, keyword, etc

5. Create an online knowledge base of existing (ATCA) solutions to applications (hardware, software, tools, etc)

6. Develop LLRF algorithm inter-operability standard to be able to exchange algorithms and test at different facilities eg Adaptive feed-forward algorithm…

Exchanging LLRF algorithms [message #884 is a reply to message #882] Thu, 31 May 2007 01:47 Go to previous messageGo to next message
carwardine
Messages: 13
Registered: May 2007
Location: Argonne National Laborato...
Means to exchange algorithms should have following features...

1. Should be independent of…
o Sample rate
o Hardware implementation (fpga, dsp, micro, analog)
o Software/code platform

2. Should define
o Available signals for input
o Required signals for output
o Required signals for debugging
o A common way to describe the algorithm… eg flow chart, difference equation, transfer function, Matlab/Simulink blocks, etc
template for new work packages [message #892 is a reply to message #882] Thu, 31 May 2007 04:05 Go to previous messageGo to next message
g-gollin
Messages: 1
Registered: May 2007
Location: University of Illinois
Here is a proposed template file for new work package documents. Comments/corrections/suggestions to g-gollin@uiuc.edu please. I will update the file and post a revised version.

Re: Proposed new work packages, work packages that that need to be done [message #895 is a reply to message #882] Thu, 31 May 2007 08:14 Go to previous messageGo to next message
michizon
Messages: 3
Registered: May 2007
- Evaluation of rf power overhead
- FB performance under the given overhead in RDR.
- how can we improve the performance by klystron linearization, adaptive FF algorithm and so on.
ATCA evaluation for Detector DAQ needs [message #915 is a reply to message #882] Wed, 13 June 2007 03:59 Go to previous message
carwardine
Messages: 13
Registered: May 2007
Location: Argonne National Laborato...
The detector DAQ group is interested in ATCA largely because of the potential for implementing high channel density. What does the work package look like that addresses their questions? Does this require a separate work package from other ATCA evaluation efforts, or is there something viable that addresses common interest?
Previous Topic:R&D prototypes that could be developed to gain field experience at an operating facility
Goto Forum:
  

[ PDF ]

Current Time: Thu Apr 19 14:36:37 Pacific Daylight Time 2018
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.1.
Copyright ©2001-2010 FUDforum Bulletin Board Software