Linear Collider Forum



Home » ILC Accelerator Design » Global Controls » Proposed new work packages, work packages that that need to be done
Proposed new work packages, work packages that that need to be done [message #882] Thu, 31 May 2007 01:45 Go to previous message
carwardine
Messages: 13
Registered: May 2007
Location: Argonne National Laborato...
Please add to this you see fit...

1. Write test criteria for... LLRF system, Controls front-end, Controls Middleware, etc

2. Write use cases for... LLRF software, Controls applications, Remote access, etc

3. Develop algorithms/methods for bpm introspection

4. Create online list of work being done now – by topic, keyword, etc

5. Create an online knowledge base of existing (ATCA) solutions to applications (hardware, software, tools, etc)

6. Develop LLRF algorithm inter-operability standard to be able to exchange algorithms and test at different facilities eg Adaptive feed-forward algorithm…

 
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic:R&D prototypes that could be developed to gain field experience at an operating facility
Goto Forum:
  


Current Time: Mon Oct 15 22:21:41 Pacific Daylight Time 2018
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.1.
Copyright ©2001-2010 FUDforum Bulletin Board Software