Linear Collider Forum



Home » ILC Accelerator Design » Global Controls » R&D prototypes that could be developed to gain field experience at an operating facility
Re: R&D prototypes that could be developed to gain field experience at an operating facility [message #888 is a reply to message #880] Thu, 31 May 2007 03:38 Go to previous messageGo to previous message
michizon
Messages: 3
Registered: May 2007
O LLRF system for STF modulator #1
O LLRF system for STF modulator #2
O STF LLRF-network server and EPICS installation
O Development of FPGA interlock system
O Development of high-sensitivity arc detector
O Development of intermediate frequency (IF) mixture method
-for the reduction of the number of ADCs half or 1/3
 
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic:Questions relating to Controls & LLRF and the ILC EDR
Next Topic:Proposed new work packages, work packages that that need to be done
Goto Forum:
  


Current Time: Thu May 24 08:30:22 Pacific Daylight Time 2018
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.1.
Copyright ©2001-2010 FUDforum Bulletin Board Software