Linear Collider Forum



Home » ILC Accelerator Design » Global Controls » Proposed new work packages, work packages that that need to be done
Re: Proposed new work packages, work packages that that need to be done [message #895 is a reply to message #882] Thu, 31 May 2007 08:14 Go to previous messageGo to previous message
michizon
Messages: 3
Registered: May 2007
- Evaluation of rf power overhead
- FB performance under the given overhead in RDR.
- how can we improve the performance by klystron linearization, adaptive FF algorithm and so on.
 
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic:R&D prototypes that could be developed to gain field experience at an operating facility
Goto Forum:
  


Current Time: Thu Jul 19 10:40:10 Pacific Daylight Time 2018
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.1.
Copyright ©2001-2010 FUDforum Bulletin Board Software