Linear Collider Forum



Home » ILC Accelerator Design » Global Controls » R&D prototypes that could be developed to gain field experience at an operating facility
FNAL's additional R&D plan [message #898 is a reply to message #880] Fri, 01 June 2007 04:42 Go to previous message
michizon
Messages: 3
Registered: May 2007
No Message Body

  • Attachment: WBS ideas.doc
    (Size: 33.50KB, Downloaded 698 times)
 
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic:Questions relating to Controls & LLRF and the ILC EDR
Next Topic:Proposed new work packages, work packages that that need to be done
Goto Forum:
  


Current Time: Fri Aug 17 10:21:21 Pacific Daylight Time 2018
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.1.
Copyright ©2001-2010 FUDforum Bulletin Board Software