Linear Collider Forum



Home » ILC Accelerator Design » Global Controls » Proposed new work packages, work packages that that need to be done
ATCA evaluation for Detector DAQ needs [message #915 is a reply to message #882] Wed, 13 June 2007 03:59 Go to previous message
carwardine
Messages: 13
Registered: May 2007
Location: Argonne National Laborato...
The detector DAQ group is interested in ATCA largely because of the potential for implementing high channel density. What does the work package look like that addresses their questions? Does this require a separate work package from other ATCA evaluation efforts, or is there something viable that addresses common interest?
 
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic:R&D prototypes that could be developed to gain field experience at an operating facility
Goto Forum:
  


Current Time: Tue Oct 17 17:10:40 Pacific Daylight Time 2017
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.1.
Copyright ©2001-2010 FUDforum Bulletin Board Software